Pre-deployment Site Checklist
This is sample content in the template; all items are examples. Applies to ARX OS 1.1 and later. This page lists key points only. For initial setup after power-on, see ARX Product Guide — Initialization.
Rack and power
Section titled “Rack and power”- Rack space and load capacity confirmed
- Power requirements confirmed; a UPS is recommended
Network
Section titled “Network”| Item | What to prepare | Owner |
|---|---|---|
| Uplink | Switch ports and cables | Customer IT |
| IP plan | Management IP, subnet mask, gateway (example subnet 192.0.2.0/24) |
Customer IT |
| DNS / NTP | At least two DNS servers; a reachable NTP server | Customer IT |
| Proxy | If internet access goes through a proxy, get its address first | Customer IT |
| Firewall | Request rules based on the official list of service ports | Customer IT |
On the day
Section titled “On the day”- A management laptop can reach the same subnet
- DNS, NTP, and proxy settings are at hand
Site updated:
This site provides reference material only. Official information is published on the official website.
© 2026 ARDGE
